Part Number : CK-104 LONG LEAD
Alternate P/N : CK104LONGLEAD
NSN : 5910001135499
Item Name : Capacitor Fixed Cer
Manufacturer : Crl Components Inc
CAGE Code : 71590
FSC Details : 5910 capacitors
Good news! Part number CK-104 LONG LEAD with NSN 5910001135499 by Crl Components Inc is available and ready to ship. NSN Sourcing, owned and operated by ASAP Semiconductor, offers the fastest lead times in the industry. If you are interested in ordering part number CK-104 LONG LEAD, leave your procurement process to us. Simply fill out the fields in the RFQ below. Your responses to the asterisk (*) marked fields are necessary in order to build your quote possible.
As a globally trusted distributor, our comprehensive inventory is unmatched across the aerospace and aviation, marine, railway, and defense industries. Owned and operated by ASAP Semiconductor, we have more than 10 million National Stock Numbers (NSN) in our ready-to-ship inventory. Our company is committed to quality, and we operate as an AS9120B, ISO 9001:2015, and FAA AC 0056B certified company.
Note : We will not share your information to any third parties.
With locations in the US, we provide an optimized purchasing solution to get the parts you need, when you need them. We have dedicated offices in California and Nevada.
A National Stock Number, or NATO Stock Number (NSN), is allocated by the Defense Logistics Agency (DLA) and suggests that an item is procured, stocked, and issued through the federal supply system. The NSN part CK-104 LONG LEAD is recognized by the United States Department of Defense and the North Atlantic Treaty Organization (NATO). Not sure if this is what you’re looking for? No problem. To receive more information about NSN Number 5306015721907, please contact us at our toll-free number +1-714-705-4780 or email us at sales@nsn-sourcing.com.
NSN | FSC | NIIN | CLS | Hazmat | DEMIL | Cancelled NSN |
---|---|---|---|---|---|---|
5910-00-113-5499 Item Description: Capacitor Fixed Cer | 5910 | 001135499 | 0 | P | A | |
CIIC | HCC | ESD | PMIC | Criticality | ENAC | |
U | A | A | 0 | |||
Part Number | ISC | RNVC | RNCC | HCC | MSDS | SADC |
Ck-104 Long Lead | B | 1 | C | A |
MRC | Criteria | Characteristic |
---|---|---|
AAQL | BODY STYLE | W/O MTG FACILITIES TERMINAL(S) ON ONE SURFACE |
AARG | RELIABILITY INDICATOR | ESTABLISHED |
AARH | RELIABILITY FAILURE RATE LEVEL IN PERCENT | 0.0010 |
ABJT | TERMINAL LENGTH | 1.250 INCHES MINIMUM |
ADAQ | BODY LENGTH | 0.290 INCHES NOMINAL |
ADAT | BODY WIDTH | 0.290 INCHES NOMINAL |
ADAU | BODY HEIGHT | 0.090 INCHES NOMINAL |
AEBP | CENTER TO CENTER DISTANCE BETWEEN TERMINALS PARALLEL TO LENGTH | 0.200 INCHES NOMINAL |
AEBT | TERMINAL DIAMETER | 0.025 INCHES NOMINAL |
AEBZ | SCHEMATIC DIAGRAM DESIGNATOR | NO COMMON OR GROUNDED ELECTRODE(S) |
CQBF | INSULATION RESISTANCE AT MAXIMUM OPERATING TEMP | 10000.0 MEGOHMS |
CQBQ | CAPACITANCE VALUE PER SECTION | 0.100 MICROFARADS SINGLE SECTION |
CQFB | VOLTAGE TEMP LIMITS PER SECTION IN PERCENT CAPACITANCE CHANGE | -25.0/+15.0 WITH RATED VOLTAGE APPLIED SINGLE SECTION |
CQJJ | NONDERATED OPERATING TEMP | -55.0 DEG CELSIUS MINIMUM AND 125.0 DEG CELSIUS MAXIMUM |
CQWM | NONDERATED CONTINUOUS VOLTAGE RATING AND TYPE PER SECTION | 100.0 DC SINGLE SECTION |
CRTP | TOLERANCE RANGE PER SECTION | -10.00/+10.00 PERCENT SINGLE SECTION |
CWJK | CASE MATERIAL | PLASTIC |
CWPK | INSULATION RESISTANCE AT REFERENCE TEMP | 100000.0 MEGOHMS |
CWPM | DISSIPATION FACTOR AT REFERENCE TEMP IN PERCENT | 2.5000 |
CWSG | TERMINAL SURFACE TREATMENT | SOLDER |
NHCF | NUCLEAR HARDNESS CRITICAL FEATURE | HARDENED |
TEST | TEST DATA DOCUMENT | 81349-MIL-C-39014 SPECIFICATION (INCLUDES ENGINEERING TYPE BULLETINS, BROCHURES,ETC., THAT REFLECT SPECIFICATION TYPE DATA IN SPECIFICATION FORMAT; EXCLUDES COMMERCIAL CATALOGS, INDUSTRY DIRECTORIES, AND SIMILAR TRADE PUBLICATIONS, REFLECTI |
TTQY | TERMINAL TYPE AND QUANTITY | 2 UNINSULATED WIRE LEAD |
ZZZK | SPECIFICATION/STANDARD DATA | 81349-MIL-C-39014/2 GOVERNMENT SPECIFICATION |
“We Proudly Support Intrepid Fallen Heroes Fund that serves United States Military Personal experiencing the Invisible Wounds of War : Traumatic Brain Injury (TBI) and Post Traumatic Stress (PTS). Please visit website (www.fallenheroesfund.org) and help in their valiant effort”.
If You’d Like to GET Quote For Latest NSN Parts, Just Fill The Instant RFQ Form And Get Reply Within 15 Minutes.
Request for Quote